GENERAL INFO
Multiple modular buildings can be easily created by stacking and interlinking individual units together. Internal wall partition can be removed and changed as need.
Prefabricated hotel is normally built on a land with temporary permit. Considering the possibility of moving after the effective period, container hotel minimized the cost of relocation.
Container houses are used as hotel rooms in many national park or caravan camp. Fuunzo developed screw pipe to replace normal concrete foundations. That made sure the land will be recovered 100% when the cabins are removed.
This prefabricated hotel is located in a garden at south of Beijing, which combined by 94 container modules.
ERECTION
Building is assembled within 4 weeks. Internal staircase and corridor are also made of modular type.
FOUNDATION
The rough foundation or individual footings must be leveled especially when the modules are joined.
Individual foundation can be Precast- Concrete-Blocks or Screw Piles.
Corner needs to be bolted down to foundation using hold-down bolts to avoid movement of building.
Prefabricated Hotel |
没有评论:
发表评论